Owner-Operated · Direct Dispatch Licensed & Insured
Mon – Sun: 6:00 AM – 8:00 PM Lakeland & Polk County, FL (863) 445-4416

Concrete & Driveway Removal in Lakeland, FL

Driveways, slabs, patios, pool decks, footers and block walls broken out with our excavator and hauled in 20-yard heavy-load containers filled to the legal weight, never the rim. Concrete never goes in a 30 or 40-yard.

(863) 445-4416

Concrete weighs about 2 tons per cubic yard, so it is priced by weight and hauled in a dedicated 20-yard container loaded to roughly 10 tons — never a 30 or 40-yard, which would be too heavy to move legally. We can break it out with the excavator or haul what you have already broken. You get a per-ton price and an estimated tonnage before we start, and the scale ticket after.

What we remove

  • Driveways, aprons and parking pads
  • Patios, walkways and pool decks
  • Slabs from demolished sheds, garages and mobile homes
  • Footers, stem walls and block or brick walls
  • Pavers, stone and masonry rubble
  • Broken sidewalk and curb from site work

Two ways to do it

1. We break and haul

The excavator arrives with the container. We saw-cut where a clean edge matters, break the slab into liftable pieces, separate rebar and wire mesh, load, and leave a graded, rake-clean area. A typical two-car driveway is out in a morning.

2. You break, we haul

Already have a jackhammer crew or a rented breaker? We drop a 20-yard heavy-load container, mark the fill line, and pick it up when you call. Same weight-based price, no labor.

Why concrete is priced by weight

Concrete area (4″ thick)Approx. weightContainer plan
Small patio, 10 × 12 ft~3 tonsOne 20-yard heavy load, part-filled
Single-car driveway, 10 × 20 ft~5 tonsOne 20-yard heavy load
Two-car driveway, 20 × 20 ft~10 tonsOne 20-yard heavy load, filled to the line
Two-car driveway + walkway + patio15–20 tonsTwo heavy loads, scheduled swap

A 20-yard container filled to the rim with concrete would weigh about 40 tons — four times the legal road limit for the truck. Every hauler faces the same physics; the difference is whether they tell you before or after the scale.

Why concrete only goes in a 20-yard

Concrete is accepted in a 20-yard container only. At about 2 tons per cubic yard, a 30-yard filled with concrete would weigh around 60 tons and a 40-yard around 80 — several times what the truck can legally carry, and enough to damage the container. A 20-yard loaded to its marked line (roughly 10 tons) is the largest concrete load that can leave your driveway legally, so that is the only size we deliver for it. Bigger jobs get a second 20-yard on a scheduled swap, not a bigger box.

What it costs

Quotes combine a per-ton disposal rate, the container trip, and excavator time if we are breaking. Polk County's construction-and-demolition disposal rate is $46 per ton as of October 2025; clean concrete routed to a recycler can come in under that. We give you an estimated tonnage from the square footage and thickness, and bill the actual scale weight — never a guess in our favor. See how pricing works.

Service area

Concrete jobs run across Lakeland, Mulberry, Bartow, Auburndale, Winter Haven, Plant City and, by schedule, east Polk and Tampa. See service areas. For full structures, see mobile home demolition.

Measure it, text it, get a number

Length, width, thickness and a photo. We estimate the tonnage and quote the whole job before the excavator moves.

(863) 445-4416

Frequently asked questions

About 2 tons (4,000 lb) per cubic yard, or roughly 50 lb per square foot at 4 inches thick. A 20 × 20 ft driveway section at 4 inches is around 10 tons. That is why concrete is priced by weight, and why a container is never filled to the rim with it.

Only as a dedicated concrete load in a 20-yard container, filled to the line we mark at roughly 10 tons. We never put concrete in a 30 or 40-yard — a larger container of concrete would be too heavy to move legally. Mixing concrete into a general debris load almost always produces an overweight bill. Order it as concrete and we quote the weight up front.

Either. Our excavator breaks and loads driveways, slabs and pool decks in a morning. If you have already broken it up, we drop a 20-yard heavy-load container and haul it when you are done.

Clean concrete — no rebar tangles, no dirt, no trash — is routed to a recycler where accepted, which can lower the disposal cost. Mixed or dirty loads go to a permitted C&D facility.

Replacing a driveway on private property in Polk County generally does not need a demolition permit, but a new driveway apron connecting to a public street usually needs a right-of-way permit from the city or county, and HOAs often want notice. We flag it during the quote.

Call Dispatch