Owner-Operated · Direct Dispatch Licensed & Insured
Mon – Sun: 6:00 AM – 8:00 PM Lakeland & Polk County, FL (863) 445-4416

Dumpster Sizes & Local Fleet

Seven 20-yard, five 30-yard and three 40-yard roll-off containers ready for same-day delivery across Lakeland, Polk County and Tampa. Every price includes delivery, pickup and the tonnage listed.

Most homeowners need a 20-yard. Choose a 30-yard for an active construction site or whole-house remodel, and a 40-yard for mobile home demolition or land clearing. If the load is concrete, dirt or roofing, weight decides the size, not volume: concrete goes in a 20-yard only, never a 30 or 40 — see the table.

20 Yard

7 in fleet
Our most requested size
  • Approx. dimensions22′ L × 8′ W × 4′ H
  • Pickup-truck loads7–8
  • Included weight3 tons (6,000 lb)
  • Contractor bags~110–120
  • DeliverySame day before noon

Kitchen and bath remodels, flooring, roof tear-offs up to ~30–40 squares, garage and estate cleanouts, deck and shed teardowns, concrete loads to the weight limit.

Details

30 Yard

5 in fleet
Construction & whole-house remodels
  • Approx. dimensions22′ L × 8′ W × 6′ H
  • Pickup-truck loads10–12
  • Included weight4 tons (8,000 lb)
  • Contractor bags~170–180
  • DeliverySame day before noon

Framing and drywall from active sites, whole-house remodels, large estate cleanouts, mixed demolition debris with scheduled swap-outs.

Details

40 Yard

3 in fleet
Demolition & land clearing
  • Approx. dimensions22′ L × 8′ W × 8′ H
  • Pickup-truck loads15–16
  • Included weight6 tons (12,000 lb)
  • Contractor bagsMax commercial volume
  • DeliverySame day before noon

Mobile home demolition, full property clearing, commercial teardowns and bulky, light debris. Paired with our excavator on demo jobs.

Details

Side-by-side: which size for which job?

JobTypical volumeRecommended sizeWatch the weight?
Kitchen or bathroom remodel2–4 pickup loads20 yardNo
Roof tear-off, single layer, 20–40 squares3–6 tons of shingles20 yardYes — shingles run roughly 250–400 lb per square
Garage, attic or estate cleanout6–10 pickup loads20 yardNo
Concrete driveway or patio (up to ~400 sq ft, 4″)~10 tons20 yard, loaded to the road limitYes — concrete is about 2 tons per cubic yard
Whole-house remodel or new construction10–15 pickup loads30 yard with swap-outsSometimes (tile, plaster)
Mobile home demolition1–2 full 40-yard loads40 yard + excavatorNo — bulky, not dense
Storm or tree debrisVaries30 or 40 yardWet logs are heavier than they look

Dimensions are approximate and vary slightly by container. If you are between sizes, describe the pile or text us photos and we will pick for you. Read the 20 vs 30 yard guide for the most common decision.

Excavator + 40-yard demo fleet

When the job needs more than a container

We run our own excavator alongside the 30 and 40-yard containers. Mobile home demolition, concrete breakout and land clearing are done by the same team that drops the container, not subcontracted and not scheduled around someone else's calendar.

Let the calculator pick it for you

Select what you are clearing out and get a size match in seconds, or text photos of the pile and we will size it personally and reply with an exact price.

Open the size calculator

Frequently asked questions

A 20-yard roll-off is roughly 22 feet long, 8 feet wide and 4 feet tall — about the footprint of two parked cars. It holds around 7–8 pickup-truck loads or 110–120 contractor bags and comes with 3 tons of included weight.

Included tonnage is 3 tons on a 20-yard, 4 tons on a 30-yard and 6 tons on a 40-yard. Anything above that is billed per ton at the Polk County landfill rate. Concrete, dirt, brick and roofing shingles are dense, so those loads are capped by weight, not by how full the container looks. Concrete goes in a 20-yard only.

Our fleet is 20, 30 and 40-yard containers. For small jobs a 20-yard is usually the same price a broker charges for a 10-yard and gives you twice the room. If you only have a pickup load or two, our junk removal crew is often the cheaper option.

Call before the pickup and we will swap in a second container or a larger one. Going a size up at the start is cheaper than a second haul, which is why we ask about the project before quoting.

Call Dispatch