Owner-Operated · Direct Dispatch Licensed & Insured
Mon – Sun: 6:00 AM – 8:00 PM Lakeland & Polk County, FL (863) 445-4416

Mobile Home Demolition in Lakeland & Polk County

We own the excavator and the 40-yard containers, so teardown, haul-off and site clearing are one crew on one schedule. Single-wides, double-wides, sheds, decks and carports.

(863) 445-4416

A mobile home demolition in Polk County has three parts: the permit (sewer cap or septic abandonment first, then the demo permit), the teardown (one day for a single-wide with our excavator), and the haul-off (one to two 40-yard loads, metal separated for scrap). We quote all three as one number and tell you the permit steps before you commit.

What is included

  • Walkthrough, written scope and a fixed price
  • Permit checklist for Polk County or your city, and help with the application if you want it
  • Removal of decks, steps, skirting, tie-downs and piers
  • Excavator teardown and loading into 40-yard containers
  • Separation of the steel frame, axles and aluminum for scrap
  • Haul-off to a permitted facility with disposal included
  • Rake-clean site, optional rough grading
  • Optional: concrete pad removal, well or septic abandonment coordination, lot clearing

The permit part, plainly

Polk County will not issue a demolition permit until the sewer is capped by a licensed plumber under a plumbing permit that has been inspected and finalized, or — on septic — until the Health Department has issued a septic-abandonment letter. The application also needs a notarized letter from the property owner authorizing the demolition, the parcel ID, contractor licensing information, and a recorded Notice of Commencement when the job is over $5,000. The county requires a pre-demolition inspection scheduled 24 hours ahead and proof of how the debris will be disposed of. If the home sits inside Lakeland, Winter Haven, Bartow or another city, that city's building department issues the permit under similar rules.

Budget two to four weeks for permitting. We have done this enough times to know which office wants which form; read the full Florida mobile home demolition guide.

Demo day

  1. Utilities confirmed off. Power meter pulled, gas capped, water off at the meter. We check before the first bucket moves.
  2. Strip the extras. Decks, steps, skirting, awnings and the AC unit (refrigerant recovered by a licensed tech).
  3. Take it down. The excavator collapses the structure inward, away from neighbors and trees, and loads the container in place.
  4. Sort the metal. Frame, axles, hitch and aluminum are separated — that scrap offsets your cost.
  5. Clear the pad. Piers pulled, debris raked, and the site left ready for the next home, a slab or grass.

What it costs

Price depends on size (single vs. double-wide), what is attached (decks, additions, carports), what is under it (slab or piers), access for the excavator and truck, and whether we are handling the permit. A single-wide with good access is a one-day job and one to two 40-yard loads; a double-wide with additions is closer to two days and three loads. Disposal is at the county's construction-and-demolition rate, $46 per ton as of October 2025, and included in the quote.

Also demolished

Sheds, pole barns, carports, detached garages, decks, pergolas, above-ground pools and small block structures. Same crew, same day in most cases.

Send photos and the parcel address

We will tell you the permit path for your jurisdiction and quote the whole job, teardown to clear pad.

(863) 445-4416

Frequently asked questions

Yes. Polk County requires a demolition permit, and before you can apply, the sewer must be capped by a licensed plumber under its own permit (or a septic-abandonment letter obtained from the Health Department). You also need a notarized owner authorization and, if the contract is over $5,000, a recorded Notice of Commencement. Inside city limits (Lakeland, Winter Haven, etc.) the city building department issues the permit instead. Full walkthrough in the demolition guide.

Permitting is the long pole: two to four weeks is typical in Polk County. The teardown itself is one day for a single-wide and one to two days for a double-wide, including loading. Site clearing and grading add a half day.

Metal frame, axles and siding are separated for scrap; the rest goes to a permitted construction-and-demolition facility. A single-wide typically fills one to two 40-yard containers.

Yes. We pull skirting, tie-downs, piers and decks, and can break and haul the concrete pad. Utility disconnects (power meter, gas, water) are arranged with the utilities before demo day; we tell you who to call.

Yes. Sheds, carports, decks, pole barns and detached garages are common one-day jobs. Send photos and dimensions for a quote.

Call Dispatch