How dumpster rental works with Dumpster Rental King
Call or send the form, get a flat price with the included tonnage, pick a delivery window, and the container arrives on boards where you mark it. Fill it, call for pickup, and pay what you were quoted unless you go over the tonnage. Extensions are a phone call away.
- Tell us the job. Roof, remodel, cleanout, concrete or demo, plus the address. Photos of the pile get you a firmer quote faster.
- Get one number. Delivery, pickup and tonnage included. We tell you the overage rate before you book.
- Mark the spot. Driveway, side yard or job site. Street placement inside city limits needs a right-of-way permit — we will tell you if that applies.
- Load it. Level with the rim, nothing from the prohibited list. Concrete goes in a 20-yard only and is loaded to the weight limit, not the top.
- Call for pickup. Same or next day. Need it longer? Say so, and we extend by the day.